docs(runtime): close communication ownership
Record J4.1's single Runtime communication/social graph, failure-safe ordered chat stream, complete Release evidence, exact-binary lifecycle/reconnect acceptance, rollback, and the J4.2 inventory transaction boundary. Synchronize architecture, roadmap, milestones, agent guidance, and durable memory. Co-authored-by: Codex <codex@openai.com>
This commit is contained in:
parent
c9d25ade50
commit
595d5e6b01
9 changed files with 169 additions and 14 deletions
13
CLAUDE.md
13
CLAUDE.md
|
|
@ -237,7 +237,13 @@ disposal converge the complete ownership ledger to zero. Runtime tests pass
|
|||
146/146, App tests pass 3,765/3 skips, the complete Release suite passes
|
||||
8,484/5 skips, and both the exact lifecycle/reconnect and canonical nine-stop
|
||||
routes pass with graceful zero-code exits and no failures. J3 is closed; J4
|
||||
gameplay-state lifetime groups are active. J0's rollback is
|
||||
gameplay-state lifetime groups are active. J4.1 is complete at `c9d25ade`:
|
||||
`RuntimeCommunicationState` owns the exact chat transcript, reply/retell
|
||||
targets, negotiated rooms, friends, and squelch state; graphical and no-window
|
||||
consumers borrow them. Runtime tests pass 152/152, App tests pass 3,765/3
|
||||
skips, the complete Release suite passes 8,494/5 skips, and the exact-binary
|
||||
seven-checkpoint lifecycle/reconnect gate passes with graceful exits and zero
|
||||
failures. J4.2 inventory transaction ownership is active. J0's rollback is
|
||||
`git revert b632672e5ccabfb44c551e08f1c411ab2669c44a`.
|
||||
J1's rollback is
|
||||
`git revert 854d9e9cd13092bd5aaa3cf025d73eeb4600e9f8`.
|
||||
|
|
@ -254,13 +260,16 @@ J3.5's rollback is
|
|||
`git revert ce3ac310d92722ffb637e81cb1957458874dd220`.
|
||||
J3.6's rollback is
|
||||
`git revert 119b7c115107245546180b2f5cb3cb44c7d5476a`.
|
||||
J4.1's rollback is
|
||||
`git revert c9d25ade50c0a5c4f7db5b6cca680e01e35cc18e`.
|
||||
Slice H's retained UI/frame, bounded-light, and pooled/borrowed/direct network
|
||||
work is complete; the exact seven-checkpoint connected lifecycle/reconnect gate
|
||||
passes. Slice I is closed in
|
||||
`docs/plans/2026-07-25-modern-runtime-slice-i.md`; the coherent Slice J campaign
|
||||
executes from `docs/plans/2026-07-25-modern-runtime-slice-j.md`; J3.6 closeout
|
||||
is `docs/research/2026-07-26-slice-j3-6-lifetime-closeout.md`; J4 executes from
|
||||
`docs/plans/2026-07-26-modern-runtime-slice-j4.md`. The exact G4
|
||||
`docs/plans/2026-07-26-modern-runtime-slice-j4.md`; J4.1 closeout is
|
||||
`docs/research/2026-07-26-slice-j4-1-communication-state.md`. The exact G4
|
||||
visual rollback
|
||||
is `git revert ef1d263337997bb030eadb7b8e71d73dc659907a`; do not revert G3 or
|
||||
the portal-warmup corrections. Evidence:
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue