plan(N.4): full implementation plan + CLAUDE.md pointer
28-task plan covering 4 weeks of work organized as: - Week 1 (Tasks 1-10): WB plumbing + atlas for static scenery + conformance - Week 2 (Tasks 11-15): streaming integration + memory budget verification - Week 3 (Tasks 16-21): per-instance customization + animation - Week 4 (Tasks 22-28): full draw dispatcher + visual verification + ship Living document — task checkboxes marked as commits land; adjustments appended in-place rather than rewriting earlier tasks. Conformance tests run before substitution per N.1/N.3 pattern. Behind ACDREAM_USE_WB_FOUNDATION=1 feature flag during weeks 1-3. CLAUDE.md updated with a "Currently in flight" pointer in the Roadmap discipline section so future agents pick up the plan as authoritative for rendering work. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
parent
9bb6b254dc
commit
506b86ba86
2 changed files with 2477 additions and 0 deletions
10
CLAUDE.md
10
CLAUDE.md
|
|
@ -437,6 +437,16 @@ acdream's plan lives in two files committed to the repo:
|
|||
acceptance criteria. Do not drift from the spec without explicit user
|
||||
approval.
|
||||
|
||||
**Currently in flight: Phase N.4 — Rendering Pipeline Foundation.** Plan
|
||||
at [`docs/superpowers/plans/2026-05-08-phase-n4-rendering-foundation.md`](docs/superpowers/plans/2026-05-08-phase-n4-rendering-foundation.md).
|
||||
Spec at [`docs/superpowers/specs/2026-05-08-phase-n4-rendering-foundation-design.md`](docs/superpowers/specs/2026-05-08-phase-n4-rendering-foundation-design.md).
|
||||
This is a 3-4 week phase adopting WB's `ObjectMeshManager` + `TextureAtlasManager`
|
||||
as our shared rendering infrastructure. The plan is a **living document** —
|
||||
task checkboxes get marked as commits land, adjustments are appended in-place,
|
||||
weeks 2-4 may be revised based on week 1 discoveries. Read the plan's "Plan
|
||||
Living-Document Convention" section before contributing. After N.4 ships
|
||||
this pointer is removed and the plan's status flips to "Final."
|
||||
|
||||
**Rules:**
|
||||
|
||||
1. Before starting a new phase or sub-piece, re-read the roadmap and the
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue