docs(launcher): Campaign LA close LA1 and LA3
This commit is contained in:
parent
8a03a25fc3
commit
3313577dcc
3 changed files with 11 additions and 2 deletions
|
|
@ -103,6 +103,11 @@ a future campaign). Spec:
|
|||
[`2026-08-14-launcher-campaign-design.md`](../superpowers/specs/2026-08-14-launcher-campaign-design.md);
|
||||
plan + ledger:
|
||||
[`2026-08-14-launcher-campaign.md`](2026-08-14-launcher-campaign.md).
|
||||
LA0, LA1, LA3, and LA7a are review-closed: the portable path boundary,
|
||||
failure-isolated launch/status contract, BCL-only launcher core, shared
|
||||
composer-to-both-host-loader anti-drift gate, and character wire messages are
|
||||
landed. LA2 probe/idle review fixes are the active recovery edge before the
|
||||
Avalonia/plugin/selection parallel wave.
|
||||
|
||||
**Remaining physics-divergence closeout (ACTIVE, checkpoint 2026-08-03):** the user then
|
||||
authorized retirement of the remaining proven collision/placement gaps before
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue