docs: Phase A8 — mark prior restructure design+plan as SUPERSEDED

Both documents retained for historical reference. The new full-WB-port
design + plan (2026-05-26-phase-a8-wb-full-port-design.md + plan, ea60d1f +
651e7e2) replace them.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
Erik 2026-05-27 10:08:48 +02:00
parent fd721afdf9
commit 29e306b0f6
2 changed files with 16 additions and 0 deletions

View file

@ -1138,3 +1138,11 @@ Total estimated time: ~2.53 hours assuming RR0 doesn't trigger scope expansio
- RR4 transition FAILED + not pre-existing → STOP, re-brainstorm.
All gates explicit; no dead-ends.
---
**SUPERSEDED 2026-05-26 (PM) by [2026-05-26-phase-a8-wb-full-port.md](2026-05-26-phase-a8-wb-full-port.md).**
This plan implemented the "WB-faithful restructure" design which RR0 evidence invalidated. The new plan implements the full WorldBuilder RenderInsideOut + RenderOutsideIn port. RR0 was completed and its findings doc is retained.
This document is retained for historical reference.