docs(physics): plan the placement production cutover
The continuation executor (5db3de3c) completed the dormant residence
mechanism; the cutover is the campaign leg that makes it production truth.
The committed 8-route inventory maps every duplicate placement authority in
both hosts with exact call chains, confirms the placement-receipt observer
seam is fully built but unattached, and surfaces five pre-cutover gaps the
shipped mechanism cannot yet express (executor-to-channel bridge, atomic
controller/body publication, the 1,880 B/op activation budget, Runtime-side
live-input derivation, the portal-authority adapter). The plan decomposes
the cutover into C0-C5 bisectable slices under the campaign's standing
contract/dual-review/gate discipline, ending at the connected routes and
the user visual matrix that retire AP-1/AD-1.
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
This commit is contained in:
parent
9ad590dcc7
commit
27e05b99e4
2 changed files with 1131 additions and 0 deletions
1042
docs/research/2026-08-02-cutover-route-inventory.md
Normal file
1042
docs/research/2026-08-02-cutover-route-inventory.md
Normal file
File diff suppressed because it is too large
Load diff
Loading…
Add table
Add a link
Reference in a new issue