docs(plan): Indoor walking Phase 1 — BSP cluster implementation plan
14-task plan covering the diagnostic-driven phase: probe + capture + three fix commits + docs. Tasks 1-6 land the [indoor-bsp] probe in one feature commit. Task 7 is the user-run capture gate. Tasks 8-11 do post-capture diagnosis + fix for #84 and #85 (with a route-δ escape hatch if #85's fix turns out to be a large cross-cell port). Tasks 12-13 ship the WorldPicker cell-BSP occlusion fix for #86 (no capture dependency — pinned by code-reading). Task 14 closes out ISSUES.md + roadmap + ships the post-phase handoff doc. Spec: docs/superpowers/specs/2026-05-19-indoor-walking-phase1-bsp-cluster-design.md Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
parent
59a4e3f6cf
commit
18a2e28875
1 changed files with 1297 additions and 0 deletions
File diff suppressed because it is too large
Load diff
Loading…
Add table
Add a link
Reference in a new issue