docs: close the placement cutover ledger — #280 user-passed, remaining gates NOT RUN
Campaign closed by user direction after the #280 connected gate passed. GATE RESULT. #280 user-accepted: "now portal space takes longer but terrain is complete when I exit" — both halves of the specified criteria, a measurably longer hold and a complete destination on reveal. Probe evidence: three Portal reveals plus a Login reveal, every one at radius=12 where pre-fix it was a hardcoded 1, each portal hold raising the wait cue at ~5.0 s before completing. An accidental but genuine A/B came out of the same session. An earlier run set ACDREAM_PROBE_REVEAL_RADIUS=1 — that variable is a radius VALUE, not an on/off flag — which forced the pre-fix window. The user saw the original defect under it and not under radius=12. That is the before/after pair the gate asked for, obtained by mistake. Recorded prominently because the same mistake would silently reproduce the bug for the next person. WHAT IS NOT CLAIMED. The ledger closes with most connected gates outstanding BY USER DIRECTION, not because they were discharged: D-1's two reachability scenarios, AP-136's six-step park protocol, route-7 thickening (the remote-teleport probe recorded ZERO lines), the two-client observation, the nine-stop soak, and the lifecycle/reconnect route. The closeout's section 2.6 is a table of exactly this, and both the campaign plan banner and this commit say that anyone citing "the campaign passed" must cite it alongside. THE PROBE FAMILY IS DELIBERATELY NOT STRIPPED. Closing the campaign would normally retire the six ACDREAM_PROBE_* flags, but their gates were never run, and stripping now would delete precisely the instrumentation those owed gates need — the failure the handoff's own rule exists to prevent. Honouring that rule means not stripping even though the campaign is closing. ACDREAM_PROBE_REVEAL_RADIUS is also kept despite #280 closing, because AP-149 and #326 are open and would both want the same A/B harness. #280 is marked CLOSED in ISSUES with its gate evidence, and its residual AP-149 is restated there: our outer ring accepts terrain-only readiness where retail's PreFetchCells also requires each landblock's LandBlockInfo and every building's EnvCells, so distant SCENERY may still fill in after reveal even though terrain does not. Not folded in — it costs further hold time and is a game-feel call. Memory updated with the campaign's closed state and the follow-up order: #331 first, then AP-152, #330, AD-65. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
This commit is contained in:
parent
1304dafa8b
commit
0d62a5ffeb
3 changed files with 111 additions and 7 deletions
|
|
@ -1,5 +1,28 @@
|
|||
# Placement production cutover — campaign plan (2026-08-02)
|
||||
|
||||
> ## ✅ CAMPAIGN LEDGER CLOSED — 2026-08-06, by user direction
|
||||
>
|
||||
> Every slice is landed and dual-reviewed: **C0–C4**, **C5a**, **C5b**
|
||||
> (#275; retired AP-131 + AD-60's legacy half), **#280** (portal destination
|
||||
> prefetch, user-accepted at its connected gate), **#276's remainder**,
|
||||
> **AP-22** and **AD-10** (both retired). **#309** was accepted as a standing
|
||||
> divergence rather than fixed. Final gate: complete Release suite from a
|
||||
> clean build, **11,196 passed / 4 skipped / 0 failed** — campaign net +90
|
||||
> from 11,106.
|
||||
>
|
||||
> **The ledger closes with connected gates outstanding, by user direction —
|
||||
> not because they were discharged.** Only #280's reveal gate was run and
|
||||
> passed. D-1's two reachability scenarios, AP-136's six-step park protocol,
|
||||
> route-7 thickening, the two-client observation, the nine-stop soak and the
|
||||
> lifecycle/reconnect route were **NOT RUN**; the probe family is
|
||||
> **deliberately NOT stripped** for that reason. Anyone citing "the campaign
|
||||
> passed" must cite §2.6 of the closeout alongside it:
|
||||
> [`2026-08-06-c5c-closeout-handoff.md`](../research/2026-08-06-c5c-closeout-handoff.md).
|
||||
>
|
||||
> Follow-ups generated and filed rather than folded in: **#325**, **#330**,
|
||||
> **#331**, **#332**, **AP-149**, **AP-152**, **AD-65**, **AD-66**. Start with
|
||||
> **#331**.
|
||||
|
||||
The final leg of the remaining physics-divergence campaign before AP-22 and
|
||||
AD-10: route graphical AND headless production placement through the
|
||||
residence + continuation-executor owner (`38fd4b8d` / `30012361` /
|
||||
|
|
|
|||
Loading…