diff --git a/docs/plans/2026-07-30-physics-parity-visual-matrix.md b/docs/plans/2026-07-30-physics-parity-visual-matrix.md index 6557e064..3004a119 100644 --- a/docs/plans/2026-07-30-physics-parity-visual-matrix.md +++ b/docs/plans/2026-07-30-physics-parity-visual-matrix.md @@ -33,3 +33,27 @@ reopens its slice; the campaign closes only on a clean sheet. On full pass: close #165/#166/#116/#262 (if not already), mark #172–#175/#41 reconciled with this matrix as the cited gate, update the campaign plan + roadmap + CLAUDE.md current-state, and flip the goal. + +## Automated pillars — BANKED 2026-07-30 (pre-user-session) + +Run on the final tree (post all Campaign P slices), local ACE: + +- **Lifecycle/reconnect gate: PASS** — + `logs/connected-world-gate-20260730-130611/report.json` (seven + checkpoints, graceful exits). Covers scenario 12's login/portal/ + teardown backbone. +- **Canonical nine-stop soak: PASS** — + `logs/connected-r6-soak-20260730-131141.report.json` (production- + dispatcher movement input across nine stops). Covers scenario 12's + movement-regression backbone. +- **Scenario 11 (20 fresh logins): PASS, automated basis** — 20/20 + fresh-process logins (`artifacts/262-probe/login-{1..20}.log`): every + attempt committed the `[snap]` OUTDOOR server-Z branch, held a live + resolve stream (~5.3-6.0k lines/40 s), recentered correctly + (incidentally onto far-town 0xC95B — the #153 arrival class — all 20 + times), and closed gracefully. No run-on-the-spot signature. The + user's eyes-on confirmation of "movement immediate" on a couple of + manual logins completes the scenario. + +Remaining for the user session: scenarios 1-10 (feel/visual) + the +manual halves of 11-12.